HACCP Guardian

Is your ceiling hygiene management still based on “visual inspection”?

For quality control managers at food factories
We take on the risk of adopting
new building materials

HACCP Guardian

HACCP Guardian is a systematic service that provides not only anti-mold ceiling boards but also regular inspections, records, and corrections as an integrated package. We take on the risk of 1-2 regular hygiene inspections per year and any risks arising from adoption. In the event of mold caused by the ceiling board, we cover free replacement, re-installation, full cleaning costs, and line stoppage inconvenience fee (with upper limit).

HACCP Guardian mark
Image: Three-component structure diagram of 'Product, Evidence, Insurance' to make settlement risk zero

Hygiene management package combining
“Product + Evidence + Warranty”

  • Product
    Photo of cells and elements

    AGX BioGuard ZERO MOLD BOARD
    (Anti-mold ceiling board)

  • Evidence
    Image: Paper with HACCP text written on it

    1-2 hygiene inspections per year /
    mold testing / certificate issuance

  • Insurance
    Person wearing gloves conducting inspection in laboratory

    Conditional compensation for replacement,
    re-installation, cleaning costs, etc.

At the time of audit,
this single document completes the explanation.

The only method to eliminate audit compliance
and claim risks in advance.

Product: The world's highest standard anti-mold ceiling board that fundamentally prevents condensation Evidence: 'Periodic hygiene report and certificate' that eliminates audit stress Insurance: 'Damage compensation in case of emergency' that relieves the burden of the person responsible for adoption Overwhelming cost-effectiveness difference between conventional anti-mold measures and HACCP Guardian

HACCP Guardian
Annual Service Flow

Covering everything from adoption
to audit compliance

Flow diagram showing steps from adoption

In case mold is detected (Pilot plan)

Flow diagram when mold is detected
Flow diagram before and after adoption

Ceiling hygiene management by visual inspection alone is insufficient. Invisible mold recurs and becomes an audit risk. This service manages with product, evidence, and warranty.

Three provision phases tailored to customer situations

Ready: Basic plan for audit compliance

Basic plan for reliably passing HACCP compliance and audits

Basic plan for audit compliance. Visualize hygiene status with certificates.

Pilot: Enhanced warranty and shutdown risk countermeasure plan

Business continuity plan for factories that cannot be stopped

Enhanced warranty plan covering even shutdown risks.

New adoption model separating initial costs and running costs

HACCP Guardian
For those who would like detailed materials or want to know the applicability to their factory,

For those who would like detailed materials or want to know the applicability to their factory,
please feel free to contact us via the inquiry form.

画像:母親と娘がソファにいて、母親が娘の手を支えている様子